Friday, December 17, 2010

What is challenging for me in the DLC

The most challenging thing in the DLC is the projects where I have to work alone, even though I know that everything will get done on time, it takes a lot longer, and there are things that I am weak at, and makes the project a whole lot longer.

5 comments:

  1. I didn't know that you were favored group projects over individual projects, which I think is very interesting. I am the opposite way, but I understand you reasoning for why you dislike working alone. I agree that it sometimes takes longer to get a project done when you work alone. :)

    ReplyDelete
  2. I LOVE the alone projects because I don't have to worry about other people not doing their work.

    ReplyDelete
  3. I like how you are being honest in how there are things you need to work on and how you're being truthful about how challenging alone projects are for you. What exactly are your challenges in your technology products?

    ReplyDelete
  4. @ devon Most of the challenges I have for technology are just basic ones, like Imovie, Keynote, and Garageband, I just don't really know that much about computers.

    ReplyDelete
  5. @ connor/elizabeth I can see why you like working alone and for some projects I prefer it, but in the longrun I think it is so much easier and faster on most project to be working with other people.

    ReplyDelete